OVERVIEW

Harbour Contractors, Inc. was selected as the general contractor for the Storage-In-Transit facility located at Chevron’s Cedar Bayou plant on a 61 acre site. The site was developed to accommodate 51,428 ft. of ballasted wood tie storage track and 1,264 ft. of direct fixation track. Additionally, 2,036 ft. of existing track was relocated.

The site development included underground drainage systems, lime-stabilized sub grade with a biaxial geogrid, and site utilities (including communication and CCTV), which were brought to the site from within the existing plant. Additionally, a concrete trans-load road, aggregate service roads, and concrete plant roads were added during this project. There is also a small office building to accommodate the expanded capabilities brought to the company from the added capacity of the SIT yard.

CLIENT

Chevron Phillips


ENGINEER

Transystems


ADDITIONAL PROJECTS

BNSF JARP Bridge
BNSF Industrial Park Rail Spur
CN Joliet Yard
625 District Drive Rail Spur
AkzoNobel Morris Track Expansion
Arkansas Rail Car Facility
CN Hawthorne Yard Rail Turnouts
CN Plainfield Turnout
Eastern Grain Track Repair
Hallstar Track Repairs
Kimball Industry Park Rail Spur
Phoenix Closures Track Replacement
Stepan Chemical Rail Improvements

SIGN UP FOR
OUR NEWSLETTER