OVERVIEW

Harbour severed as the General Contractor for the Chevron Phillips SIT Capacity Expansion Project, The facility sits on a 19 acre site and accommodates 19,987 ft. of storage track. The project included an increase in capacity for an additional 250 railcars.

The site development included underground drainage systems, lime-stabilized sub grade with a biaxial geogrid, and site utilities (including communication and CCTV), which were brought to the site from within the existing plant. Additionally, aggregate services roads, and retaining were added during this project. Harbour also added a retention pond and pump station to the SIT Yard.

CLIENT

Chevron Phillips


ENGINEER

Transystems


ADDITIONAL PROJECTS

BNSF JARP Bridge
BNSF Industrial Park Rail Spur
CN Joliet Yard
625 District Drive Rail Spur
AkzoNobel Morris Track Expansion
Arkansas Rail Car Facility
CN Hawthorne Yard Rail Turnouts
CN Plainfield Turnout
Eastern Grain Track Repair
Hallstar Track Repairs
Kimball Industry Park Rail Spur
Phoenix Closures Track Replacement
Stepan Chemical Rail Improvements

SIGN UP FOR
OUR NEWSLETTER